Skip to content
VISIT KILIADVENTURES
Portrait of a climber with Kilimanjaro's snow-capped peak clearly visible behind under a clear sky.

Planning

Flights to Kilimanjaro

JRO, then Moshi.

Most climbs start with a landing at Kilimanjaro International Airport and a transfer to Moshi or Arusha. The tour page states whether that transfer is included.

Most climbs land at JRO

Kilimanjaro International Airport, JRO, is the usual airport for a climb. It sits between Moshi and Arusha. A safari that starts in Arusha often uses the same airport.

Zanzibar International Airport is the airport for a beach finish. It is not the airport for the first day of a Kilimanjaro trek. If the trip includes both, the itinerary should say which flight is which.

The transfer is part of the plan

From JRO the drive is to Moshi for most of our climbs, or to Arusha when the trip starts there. The tour page states whether that transfer is included. If it is not listed, ask before you book the flight time.

Arrive a day before the gate. A same-day international arrival is a poor start to a walk that begins early at the park. The package day list begins at the gate, not at the airport, unless that page says otherwise.

Questions that come next

  • Many people reach the top in their forties, fifties and sixties, and plenty are not athletes. What decides it is time and preparation, not youth: choose a long route (seven or eight days), train with hills and long loaded walks for at least two or three months, and walk slowly on the mountain. If you have a heart, lung or blood-pressure condition, see your doctor before you book.

Plan with us

Tell us your dates, we reply with a plan

Open a trip

Registered & Recognized By