Skip to content
VISIT KILIADVENTURES
Four climbers celebrating at the Uhuru Peak summit sign at sunset light.

Combination

Kilimanjaro and safari in one trip

Climb first, then spend your tired legs in a safari vehicle.

Build your sequence

Kilimanjaro and safari

  1. Kilimanjaro climbDays 1 to 7

  2. Rest daysDay 8

    Rest, laundry, repack

  3. SafariDays 9 to 15

About 15 days on the ground (plus travel days)

A planning guide, not a priced package. Starting prices belong to each trip above; the combined price is confirmed in your quote.

Why this order

Who it suits

Travellers who want both big Tanzania experiences without flying twice.

  • Moshi and Arusha are close, so the climb and the northern safari parks start from the same region and need only short transfers.
  • The climb comes first for two reasons: you start it with fresh legs and a clear schedule, and the safari is a gentle way to recover afterwards.
  • One arrival and one departure flight, with a single planner for the whole trip.

Planning tips

  • Add a rest day between the end of the climb and the start of the safari.
  • Keep one buffer day before your flight home.
  • Tell us the dates you cannot move: the climb start is the fixed point, and the safari is planned around it.

FAQ

Kilimanjaro and safari questions

All questions
  • Count the climb (about 6 to 8 days), one rest day, and the safari (3 to 6 days). That is roughly 10 to 15 days on the ground, plus travel days.

Questions that come next

  • Many people reach the top in their forties, fifties and sixties, and plenty are not athletes. What decides it is time and preparation, not youth: choose a long route (seven or eight days), train with hills and long loaded walks for at least two or three months, and walk slowly on the mountain. If you have a heart, lung or blood-pressure condition, see your doctor before you book.

Trips to look at

Plan with us

Tell us your dates, we reply with a plan

Registered & Recognized By